Sunday 12th July

Sunday was wet and windy but spirits weren’t dampened and the students and volunteers ploughed on. We extended trench 9 to continue excavating the features in the geophysics survey and continued work in trenches 7 and 8, despite the weather!

Volunteer Sam excavating in trench 9
Volunteer Sam excavating in trench 9
Student Janet sieving spoil
Student Janet sieving spoil
Maggie teaching students how to take levels
Maggie teaching students how to take levels
Excavations in trench 7
Excavations in trench 7